Back to news

Kellys Point Hire are pleased to be providing site plant and equipment to Turkington Windows & Conservatories at the construction of a new Shelbourne Motors Showroom on the Tandragee Road, Newry.

This new commercial development is expected to be finished mid-summer 2019.

We visited the site yesterday to see the progress and make sure that all was well with the site plant and equipment that had been hired.

Kellys Point Hire have 3 main pieces of equipment on this site;

Our 14m Telehandler, the Manitou MT 1335 (more details at http://bit.ly/2M5HpUA)

Our 15m Diesel Scissor Lift, the Skyjack SJ 9250 (more details at http://bit.ly/2X7pMEU)

Our 18m Artic Boom Lift, the Manitou ATJ 200 (more details at http://bit.ly/2K0IVEF)

The telehandler is being used to hoist the window panes up to the correct height, and the scissor lift is being used as the platform for the men to work from to correctly fit the window panes into place.

The artic boom lift is being used for any work which requires a great height including work being done to the roof of the building.

Pictured is our own Chris Gorman along with Michael Cullen, Site Foreman for Turkingtons on this project.

A fantastic project that we’re proud to be a small part of.

If you are interested in hiring or learning more about any of the site plant and equipment featured in this post then just get in touch today!

dsc3291.jpg

dsc1720.jpg

dsc3284.jpg

dsc1758.jpg